| Level | Operation |
| 1. No control at this level | |
|
2. Grain Heaters |
Grain Heaters 50% off |
| 3. Large water heaters |
Cycled at 25% off - 75% on |
| 4. No additional loads controlled | |
| 5. Irrigation | 100% Irrigation off |
| 6. Large water heaters | Cycled at 50% off - 50% on |
| 7. No additional loads controlled | |
| 8. Grain Heaters | Grain Heaters 100% off |
| 9. No additional loads controlled | |
| 10. Large water heaters | Cycled at 75% off - 25% on |
| 11. Large water heaters | |
| 12. Air conditioning | Cycled 1/2 hour on 1/2 hour off |
| 13. Generators and Grain Fans | Commercial generators and grain fans 100% controlled |
| 14. No additional loads controlled | |
| 15. No additional loads controlled | |
| 16. No additional loads controlled |